The preconditions that must be fulfilled before a test activity can start, also called definition of ready in Agile contexts.
Syllabus chapters: 5
Sources: ISTQB® Certified Tester Foundation Level syllabus 4.0.1 and the official ISTQB® Glossary. Glossary content © International Software Testing Qualifications Board; source: glossary.istqb.org.
Related terms
Entry criteria in a practice question
Question 1
Which of the following is an example of an ENTRY criterion for test execution?
- All planned tests have been executed
- The defect backlog contains no critical open defects
- The test environment is available and configured
- The test completion report has been approved
Show answer
- All planned tests have been executedHaving executed all planned tests is an exit criterion, not an entry condition.
- The defect backlog contains no critical open defectsA clean critical-defect backlog is an exit criterion for completing testing.
- Correct answer: The test environment is available and configuredA ready, configured test environment is a precondition — an entry criterion.
- The test completion report has been approvedApproval of the completion report happens at the end, so it is an exit criterion.
Entry criteria define preconditions for starting an activity — e.g. testable requirements available, environment ready, test data prepared. Executed tests, defect thresholds, and achieved coverage are typical exit criteria.
Syllabus section 5.1.3
Question 2
Which of the following is a typical EXIT criterion for a test level?
- The test environment has been fully set up and configured for use
- The testers needed for the level have all been hired
- The requirements have all been reviewed and baselined first
- The planned coverage has been achieved and unresolved defects are within the agreed limit
Show answer
- The test environment has been fully set up and configured for useA ready environment is a precondition — an entry criterion, not an exit criterion.
- The testers needed for the level have all been hiredHaving testers in place is an entry condition, not a measure of completion.
- The requirements have all been reviewed and baselined firstBaselined requirements are an entry criterion for starting, not finishing.
- Correct answer: The planned coverage has been achieved and unresolved defects are within the agreed limitAchieved coverage with unresolved defects within the agreed limit is a typical exit criterion.
Exit criteria define when an activity can be declared complete: e.g. planned tests executed, coverage targets achieved, unresolved defects within thresholds. Environment availability and baselined requirements are entry criteria.